Government project
Fifth Summit of the Americas, 2009
Port of Spain, Trinidad and Tobago | TSTT

A turn-key solution supporting the increased communication requirements during the Summit. Client requirements included no visible antennas including radiating nodes, and zero alteration/obstruction to the aesthetic of the Hyatt Regency buildings.
Scope of Work
System design, engineer, Integration and turn-up of a "cableless" wireless infrastructure - DAS on CATV system. Period of Performance was three weeks.
Services Employed
- Design, engineering, installation, integration
- Turn-up






