Tamarac Water Storage Tank and WTP Improvements

| Tamarac, FL

Scope of Work

The City of Tamarac project consists of the construction of finished water storage and high-service pumping improvements at the existing City of Tamarac Water Treatment Plant, located at 7803 NW 61st Street, Tamarac, Florida.

Furnish and installation of five (5) new VFD driven high service vertical turbine pumps and two (2) new filter effluent transfer pumps with associated valves and piping including additional large diameter DIP underground distribution system with new 30”, 24” and12” finish water underground services. Construction also included the erection of a 2.0 MG prestressed wire tank and pump system control building.

Related Projects

Westgate Sanitary Sewer System
Water & Sewer icon

Westgate Sanitary Sewer System

Treatment Plants

Plantation, FL
Miami Dade County Spreader Canal Project
Water & Sewer icon

Miami Dade County Spreader Canal Project

Pumps & Lift Stations

West Palm Beach, FL
Broward County Filtration System
Water & Sewer icon

Broward County Filtration System

Pompano Beach, FL
305.599.1800 services@mastec.com