Merrimack Valley Reliability Project
Transmission Construction | Tewksbury , MA
Scope of Work
The focus of this project centered around the construction of a new 345kV overhead electric transmission line within an existing National Grid right-of-way (ROW) between the Tewksbury 22A Substation in Tewksbury, MA and a point of ownership transition located just south of David Drive in Hudson, NH over a distance of approximately 14.6 miles. A number of existing assets within the right-of-way corridor required relocation to accommodate the new 345kV line.
Services Employed
- AMI (automated meter installation)
Related Projects
![Natural Gas Pipeline](/user_area/content_media/raw/Northern_1-v-1.jpg?w=400&h=260&mode=carve&scale=both&format=jpg&quality=70)
![Nacogdoches, Texas Natural Gas Pipeline](/user_area/content_media/raw/Tenaska_Energy.jpg?w=400&h=260&mode=carve&scale=both&format=jpg&quality=70)
Nacogdoches, Texas Natural Gas Pipeline
Pipeline Construction in Texas
Nacogdoches, Texas
![Natural Gas Pipeline Projects](/user_area/content_media/raw/talisman.jpg?w=400&h=260&mode=carve&scale=both&format=jpg&quality=70)
Natural Gas Pipeline Projects
Pipeline Construction
New York and Pennsylvania