MasTec | Infrastructure that Delivers Leading specialty contractor engineers, designs and constructs infrastructures for electric power generation and transmission, oil and natural gas pipelines, renewable energy facilities and wireless networks.
Water & Sewer icon

Westgate Sanitary Sewer System

Treatment Plants | Plantation, FL

Scope of Work

The Westgate Lake Manor subdivision consists of 162 homes serviced by on-site treatment units (septic tanks). The installation of a public sewer system eliminated a large source of pollution affecting their ground and lake water and resulted in much cleaner and safer environment. The installation of a new water main system also provided higher flow for both consumption and fire protection.

Improvements to the City of Plantation's sanitary sewer systems, including construction of new  gravity sewer system, new duplex sanitary pumps stations, installation of 4.496 LF of 12" forcemain, 11,200 LF of sidewalk and five lift stations, Work included abandonment and demolition of existing pump station, as well as, distribution system replacement, and site restoration.

Services Provided by:

Related Projects

Tamarac Water Storage Tank and WTP Improvements
Water & Sewer icon

Tamarac Water Storage Tank and WTP Improvements

Tamarac, FL
Broward County Filtration System
Water & Sewer icon

Broward County Filtration System

Pompano Beach, FL
Miami Dade County Spreader Canal Project
Water & Sewer icon

Miami Dade County Spreader Canal Project

Pumps & Lift Stations

West Palm Beach, FL
305.599.1800 services@mastec.com