Services included fermentation and BOP expansion – concrete.
Services included fermentation and BOP expansion – concrete.
Installation of 11,000 feet of 6", 4", and 2" polyethylene natural gas pipeline by the insertion process.
Renewable energy system spanning 11,000 acres of G-1 grazing land, this project consists of 57 Vestas 2.1 MW turbines, a 167,000 linear foot collection system, 7 miles of transmission line, a 161 kV substation and a 7,200 square foot O&M building.
Wanzek was the EPC contractor for the 45 megawatt General Electric LM6000 combustion turbine generator peaking unit for the Pioneer Generation Station located near Williston, ND.
Reinforced 52 miles of 115kv steel lattice towers, removed old conductor wire and replaced it with new shield wire and OPGW.
ISP and OSP fiber and copper cable upgrades at this Army installation.
Designed and built a redundant telecommunications pathway.
3.1mw of BIPV over 31 rooftops to provide solar power to schools.
One of the premier pipeline contractors in Texas, the Enterprise M2S 24" Pipeline Project involved constructing 163 miles of 24” diameter pipeline in Texas
Pumpco constructed 65 miles of 42” diameter pipeline in Texas, as well as 10.4 miles of 36” diameter pipeline and 6.2 miles of 30”...
Constructed 143 miles of 42” diameter pipeline in Texas, from Coyanosa, Texas, to Presidio, Texas, in 8 months.
38 Miles of single circuit 500kv on monopole structures.
Clover Substation to Limber Substation 345 kV Transmission Line.
CORAL GABLES, Fla. , June 20, 2024 /PRNewswire/ -- MasTec, Inc. (NYSE: MTZ) (" MasTec ") announced that IEA Energy Services LLC , a wholly owned subsidiary of MasTec ("IEA"), has received valid consents from holders (the "Holders") of not less than a majority in principal amount of IEA's 6.625%